Do you have any question about this error?
Message type: E = Error
Message class: APO_BAPI - Message Class for APO BAPIs
Message number: 158
Message text: Collaboration partner &1 is not assigned to scenario &2
The collaboration partner &v1& entered is not assigned to the
collaboration scenario &v2&.
,,
Check the partner settings for collaboration partner &v1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
APO_BAPI158
- Collaboration partner &1 is not assigned to scenario &2 ?The SAP error message APO_BAPI158 indicates that a collaboration partner is not assigned to a specific scenario in the Advanced Planning and Optimization (APO) module. This error typically arises when you are trying to execute a function or process that requires a specific collaboration partner to be linked to a planning scenario, but the system cannot find this assignment.
Cause:
- Missing Assignment: The collaboration partner (e.g., a vendor, customer, or supplier) has not been assigned to the specified planning scenario in the system.
- Incorrect Configuration: The configuration settings for the collaboration partner or the planning scenario may be incorrect or incomplete.
- Data Inconsistency: There may be inconsistencies in the master data or configuration that prevent the assignment from being recognized.
Solution:
To resolve this error, you can follow these steps:
Check Collaboration Partner Assignment:
- Go to the relevant transaction in SAP APO (e.g.,
/SAPAPO/SDP1
for the Supply Network Planning).- Navigate to the planning scenario settings and verify if the collaboration partner is assigned to the scenario in question.
Assign Collaboration Partner:
- If the collaboration partner is not assigned, you will need to add it. This can typically be done in the planning scenario configuration.
- Use the transaction code
/SAPAPO/SDP1
to access the planning scenario and add the necessary collaboration partner.Review Configuration:
- Ensure that the configuration for both the collaboration partner and the planning scenario is correct. This includes checking the settings in the relevant customizing transactions.
- You may need to consult with your SAP Basis or APO configuration team to ensure that all necessary settings are in place.
Check Master Data:
- Verify that the master data for the collaboration partner is complete and correctly maintained. This includes checking the partner's details in the system.
Testing:
- After making the necessary changes, test the process again to ensure that the error has been resolved.
Related Information:
/SAPAPO/SDP1
for planning scenarios and /SAPAPO/OM17
for managing collaboration partners.By following these steps, you should be able to resolve the error message APO_BAPI158 and ensure that the collaboration partner is correctly assigned to the planning scenario.
Get instant SAP help. Start your 7-day free trial now.
APO_BAPI157
Document with TID &1 is not available or was deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI156
The field CP_DATE_TO must be transmitted for SNP/DP plans
What causes this issue? You have not filled the field "CP_DATE_TO" and wish to create or alter an SNP or DP plan. For SNP or DP plans one l...
APO_BAPI159
Location dependent and independent characteristics not allowed for stocks
What causes this issue? An attempt was made to generate stocks with characteristics. For this, batch numbers were used. The characteristic value assi...
APO_BAPI160
Field/parameter &1 is not currently being used
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.