Do you have any question about this error?
Message type: E = Error
Message class: APO_BAPI - Message Class for APO BAPIs
Message number: 156
Message text: The field CP_DATE_TO must be transmitted for SNP/DP plans
You have not filled the field "CP_DATE_TO" and wish to create or alter
an SNP or DP plan. For SNP or DP plans one logical component with the
name of the product must be transmitted for each product component
assignment. In addition, the field "CP_DATE_TO" on the logical
component level must be filled with the data of the field "DATE_TO" on
the product component assignment level.
This is also valid for the time-dependent paramaters of the product
component assignment.
For PP/DS plans the field "CP_DATE_TO" is of no importance.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Please enter in field "CP_DATE_TO" the "DATE_TO" date of the
"COMP_PRODUCT" entry to which the entry refers.
Error message extract from SAP system. Copyright SAP SE.
APO_BAPI156
- The field CP_DATE_TO must be transmitted for SNP/DP plans ?The SAP error message APO_BAPI156 indicates that the field CP_DATE_TO (which represents the end date for the planning period) must be provided when working with SNP (Supply Network Planning) or DP (Demand Planning) plans in SAP APO (Advanced Planning and Optimization). This error typically occurs when you are trying to execute a BAPI (Business Application Programming Interface) related to planning without specifying the required date field.
Cause:
The error is caused by the absence of the CP_DATE_TO field in the data being transmitted to the BAPI. This field is essential for defining the time frame of the planning data being processed. If it is not included, the system cannot determine the end date for the planning period, leading to this error.
Solution:
To resolve this error, you need to ensure that the CP_DATE_TO field is included in your BAPI call. Here are the steps to do this:
Identify the BAPI Call: Determine which BAPI you are using that is generating this error.
Check the Parameters: Review the parameters being passed to the BAPI. Ensure that you are including the CP_DATE_TO field.
Set the Value: Assign a valid date value to the CP_DATE_TO field. This date should correspond to the end of the planning period you are working with.
Test the BAPI: After making the necessary changes, test the BAPI call again to ensure that the error is resolved.
Related Information:
By ensuring that the CP_DATE_TO field is correctly populated, you should be able to resolve the error and proceed with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
APO_BAPI155
No mode could be determined for key &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI154
No PPM could be determined for key &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI157
Document with TID &1 is not available or was deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
APO_BAPI158
Collaboration partner &1 is not assigned to scenario &2
What causes this issue? The collaboration partner &v1& entered is not assigned to the collaboration scenario &v2&.System Response ,,...
Click on this link to search all SAP messages.