Message type: E = Error
Message class: AP - Investment program messages
Message number: 261
Message text: Plan values exist - assignment not possible due to planning lock
You tried to assign a measure (or an appropriation request) to a
program position of investment program &V1&/&V2& that has program type
&V4&.
However, there is a planning lock for planning measures (or
appropriation requests) for version &V3& of an investment program of
approval year &V2& and program type &V4&. This means that the total of
the plan values from the assigned measures and appropriation requests
for version &V3& on this investment program is not allowed to change.
But if you assign the measure (or appropriation request), the plan
value would change, since the measure (or request) has plan values for
version &V3&.
The assignment is not allowed.
Reduce the plan value of the measure (or appropriation request) in
version &V3& to zero.
If this error occurred during processing of an appropriation request,
when the request was replaced by a measure, then check all measures
assigned to the appropriation request in version &V3&, and reduce their
plan values to zero.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AP261
- Plan values exist - assignment not possible due to planning lock ?The SAP error message AP261 ("Plan values exist - assignment not possible due to planning lock") typically occurs in the context of planning and budgeting within SAP, particularly in modules like SAP Controlling (CO) or SAP Project System (PS). This error indicates that there are existing planning values for a particular object (like a cost center, internal order, or project) that are preventing further assignments or changes due to a planning lock.
Cause: Existing Plan Values: The primary cause of this error is that there are already planned values for the object you are trying to assign or modify. This means that the system has locked the planning data to prevent inconsistencies. Planning Lock: The planning lock is a mechanism in SAP that prevents changes to planning data while it is being processed or if it has already been set. Concurrent Users: If multiple users are trying to access or modify the same planning
Get instant SAP help. Sign up for our Free Essentials Plan.
AP260
Appropriation request &1 was already replaced by measure
What causes this issue? You want to change or delete an appropriation request that has already been replaced by its assigned measures.System Response...
AP259
Lack of authorization for order &1 in assigned investment program
What causes this issue? You want to change plan values for order &V1&. An investment program position is directly or indirectly assigned to t...
AP262
Plan values exist - assignment not possible due to lack of authorization
What causes this issue? You tried to assign a measure (or an appropriation request) to a program position of investment program &V1&/&V2&...
AP263
Scale &1 is unknown
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...