Do you have any question about this error?
Message type: E = Error
Message class: AP - Investment program messages
Message number: 196
Message text: Higher-level WBS element &1 is account assignmt element
You want to assign WBS element &V2& to an investment program position.
WBS element &V1&, which is next highest in the hierarchy, is an account
assignment element.
You should be aware that any actual values or commitment values on
account assignment element &V1& will not appear in IM reporting. This
is because IM reporting only takes into account those values starting
at WBS element &V2& and below in the structure.
Error message extract from SAP system. Copyright SAP SE.
AP196
- Higher-level WBS element &1 is account assignmt element ?The SAP error message AP196 indicates that a higher-level Work Breakdown Structure (WBS) element is being used as an account assignment element, which is not allowed in certain contexts. This error typically arises when trying to post costs or expenses to a WBS element that is not set up to accept such postings due to its hierarchical position or configuration.
Cause:
- WBS Hierarchy: The WBS element you are trying to use is a higher-level element in the hierarchy, which is not meant to be directly assigned costs. Only lower-level WBS elements (i.e., child elements) are typically used for account assignments.
- Configuration Settings: The system configuration may restrict certain higher-level WBS elements from being used for account assignments.
- Posting Type: The type of posting you are trying to perform may not be compatible with the higher-level WBS element.
Solution:
- Use a Lower-Level WBS Element: Instead of using the higher-level WBS element, identify and use a lower-level WBS element that is intended for account assignments.
- Check WBS Element Configuration: Review the configuration of the WBS elements in the project structure. Ensure that the WBS elements you are trying to use are set up correctly for account assignments.
- Review Posting Document: Ensure that the document you are trying to post is appropriate for the WBS element you are using. If necessary, adjust the document to reference a valid WBS element.
- Consult with Project Management: If you are unsure about which WBS element to use, consult with your project management team or SAP functional consultant to ensure compliance with project accounting practices.
Related Information:
By following these steps, you should be able to resolve the AP196 error and ensure proper account assignment in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
AP195
Error - function cannot be executed
What causes this issue? You used point of entry position &V1& to enter structure maintenance of an investment program, and you tried to delet...
AP194
WBS element &1 is already budgeted or availability control is active
What causes this issue? You tried to attach WBS element &V1& to a program position. The settings for this program position specify that all W...
AP197
Next higher WBS element already has its own budget
What causes this issue? WBS element &V1& is assigned to an investment program position, or is to be assigned to an investment program positio...
AP198
Next higher WBS element already has its own budget
What causes this issue? An appropriation request is assigned to an investment program position, or is to be assigned to an investment program positio...
Click on this link to search all SAP messages.