Message type: E = Error
Message class: AP - Investment program messages
Message number: 194
Message text: WBS element &1 is already budgeted or availability control is active
You tried to attach WBS element &V1& to a program position. The
settings for this program position specify that all WBS elements that
are assigned to it receive their budget solely from this program
position during budget distribution.
However, the WBS element &V1& that you are trying to attach already has
a budget. The budget it has received does <ZH>not</> come from an
investment program. Or, availability control is still active for the
WBS element.
In order to avoid inconsistencies, the system does not attach the WBS
element to the investment program position.
First reduce to zero all currently existing budget amounts on WBS
element &V1& (for example, using budget returns). And, if necessary,
deactivate availability control for the WBS element.
Then you can attach the WBS element to the program position, and
distribute budget amounts from the program position to the WBS element.
following text copied in part from message AP102
If you want to avoid deactivating availability control, there is
another option. You can remove 'budgeted' status on the WBS element
(transaction OPSX).
To be able to remove 'budgeted' status, you have to reduce the current
overall and annual budget on the WBS element to zero, and - very
important - you have to use the <ZH>same</> business transaction
(original, supplement, return ... ) as was used for entering the
original budget!
If the current overall and annual budgets already consist of more than
one business transaction, then you have to remove each of the budgets
separately according to the business transaction used. (In order to
avoid temporary inconsistencies, you should also ideally do this in the
reverse order to that in which the budget was posted.)
<ZH>Example</>
You create a current overall budget as follows:
RESET N1.
Original budget 1000
Supplement 200
Return 50
To remove 'budgeted' status from the WBS element, it is not enough to
enter a return of 1150, for example, even though this would reduce the
current overall budget to zero.
Instead you have to reduce the current overall budget to zero in the
following sequence:
RESET N1.
Return 50-
Supplement 200-
Set original budget of 1000 to 0.
You can only remove 'budgeted' status on the WBS element (transaction
OPSX) after following these steps.
Error message extract from SAP system. Copyright SAP SE.
AP194
- WBS element &1 is already budgeted or availability control is active ?The SAP error message AP194 indicates that a Work Breakdown Structure (WBS) element is already budgeted or that availability control is active for that WBS element. This error typically arises when you attempt to perform an action (like posting an expense or creating a new budget) that conflicts with the existing budget or availability control settings.
Cause:
- Existing Budget: The WBS element already has a budget assigned to it, and the system is preventing further budget-related actions that could exceed the allocated budget.
- Availability Control: Availability control is active for the WBS element, which means that the system is monitoring the budget consumption and preventing actions that would violate budgetary constraints.
- Incorrect Configuration: There may be configuration settings in the project system that are not aligned with the intended use of the WBS element.
Solution:
- Check Existing Budgets: Review the budget assigned to the WBS element. You can do this by navigating to the budget management transaction (e.g., CJ30) and checking if a budget is already set.
- Adjust Budget: If necessary, you can adjust the budget for the WBS element to allow for additional postings. This can be done by creating a new budget or increasing the existing budget.
- Review Availability Control Settings: Check the availability control settings for the WBS element. You can do this in the configuration settings (transaction code OPUK) to see if the settings are appropriate for your project needs.
- Consult with Project Manager: If you are unsure about making changes to the budget or availability control settings, consult with the project manager or the finance team to ensure that any changes align with project goals and financial controls.
- Transaction Codes: Use relevant transaction codes such as CJ30 (Change Budget), CJ31 (Display Budget), or CJ02 (Change WBS Element) to manage budgets and WBS elements.
Related Information:
By following these steps, you should be able to resolve the AP194 error and manage your WBS elements effectively within SAP.
Get instant SAP help. Start your 7-day free trial now.
AP193
Subordinate WBS element is already assigned to a program position
What causes this issue? You want to assign WBS element &V1& to an investment program position. The system determined that WBS element &V2...
AP192
Next higher WBS element is already assigned to a program position
What causes this issue? You want to assign WBS element &V1& to an investment program position. The system determined that WBS element &V2...
AP195
Error - function cannot be executed
What causes this issue? You used point of entry position &V1& to enter structure maintenance of an investment program, and you tried to delet...
AP196
Higher-level WBS element &1 is account assignmt element
What causes this issue? You want to assign WBS element &V2& to an investment program position. WBS element &V1&, which is next highes...
Click on this link to search all SAP messages.