Do you have any question about this error?
Message type: E = Error
Message class: AP - Investment program messages
Message number: 198
Message text: Next higher WBS element already has its own budget
An appropriation request is assigned to an investment program position,
or is to be assigned to an investment program position.
The following settings have been made for this program position:
Subordinate WBS element &V1& that is assigned to the appropriation
request, and thereby indirectly assigned to the program position,
should receive its budget solely from budget distribution from this
program position.
All WBS elements that are assigned thereby indirectly assigned to the
program position, and are above WBS element &V1& in the hierarchy, as
well as those that are above the WBS elements that are subordinate to
WBS element &V1& (in other words, these superior WBS elements are in a
"path" above WBS element &V1&), should also be budgeted automatically,
meaning they can only receive budgets equaling the amount entered for
the budget distribution. These superior WBS elements should only be
budgeted automatically in this way, that is, they are not allowed to
have their own, distributable budget.
However, at least one WBS element, which is above WBS element &V1&,
already has its own, distributable budget.
First reduce the existing distributable budget of the WBS element(s)
above WBS element &V1& to zero (for example, by using budget returns).
You can display the distributable budget in each project budgeting
function by setting the view for "distributable."
Error message extract from SAP system. Copyright SAP SE.
AP198
- Next higher WBS element already has its own budget ?The SAP error message AP198 indicates that there is an issue with budget allocation in the context of Work Breakdown Structure (WBS) elements. Specifically, it means that the next higher WBS element already has its own budget, which prevents the system from allowing further budget allocations to the lower-level WBS element.
Cause:
- Budget Constraints: The next higher WBS element has a budget that is already allocated, and the system does not allow further budget assignments to its child elements if it conflicts with the existing budget.
- Hierarchy Issues: The structure of the WBS may not be set up correctly, leading to conflicts in budget assignments.
- Budgeting Control Settings: The budgeting control settings in the system may restrict the allocation of budgets to lower-level WBS elements if the parent already has a budget.
Solution:
- Review Budget Allocation: Check the budget assigned to the next higher WBS element. If it is fully allocated, you may need to adjust the budget or reallocate funds.
- Adjust WBS Structure: If the WBS structure is incorrect, consider restructuring it to ensure that budget allocations are logical and do not conflict.
- Change Budget Control Settings: If applicable, review and modify the budgeting control settings in the system to allow for more flexibility in budget assignments.
- Consult with Finance Team: Work with your finance or controlling team to understand the implications of changing budget allocations and to ensure compliance with financial policies.
- Use Transaction Codes: Utilize relevant transaction codes (like CJ30 for budget management) to review and adjust budgets as necessary.
Related Information:
By addressing the underlying causes and following the suggested solutions, you should be able to resolve the AP198 error and manage your project budgets effectively.
Get instant SAP help. Start your 7-day free trial now.
AP197
Next higher WBS element already has its own budget
What causes this issue? WBS element &V1& is assigned to an investment program position, or is to be assigned to an investment program positio...
AP196
Higher-level WBS element &1 is account assignmt element
What causes this issue? You want to assign WBS element &V2& to an investment program position. WBS element &V1&, which is next highes...
AP199
Measure/appropriation request is still being used in investment program
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AP200
Order &1 does not exist
What causes this issue? You tried to assign order &V1&. However, this order does not exist.System Response The system cannot assign this or...
Click on this link to search all SAP messages.