How To Fix AO_PLANNING027 - Currency changed from &1 to &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S

  • Message number: 027

  • Message text: Currency changed from &1 to &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AO_PLANNING027 - Currency changed from &1 to &2 ?

    The SAP error message AO_PLANNING027 indicates that there has been a change in the currency for a planning object. This typically occurs in the context of SAP's planning applications, such as SAP Analytics Cloud (SAC) or SAP Business Planning and Consolidation (BPC), where currency settings are crucial for accurate financial planning and reporting.

    Cause:

    The error message AO_PLANNING027 is triggered when:

    • A planning document or data entry is attempted in a different currency than what was previously set or expected.
    • There may be inconsistencies in the currency settings between different planning levels or versions.
    • The currency conversion settings or master data may have been altered, leading to a mismatch.

    Solution:

    To resolve the AO_PLANNING027 error, consider the following steps:

    1. Check Currency Settings:

      • Verify the currency settings in the planning application. Ensure that the currency for the planning object is consistent with the expected currency.
      • Check if the currency has been changed in the master data or planning version.
    2. Review Planning Versions:

      • If you are using multiple planning versions, ensure that the currency settings are aligned across these versions.
      • Make sure that the version you are working on is set to the correct currency.
    3. Adjust Data Entry:

      • If you are entering data manually, ensure that you are using the correct currency as per the planning object’s requirements.
      • If necessary, convert the amounts to the expected currency before entering them.
    4. Consult Documentation:

      • Review the SAP documentation or help resources related to currency settings in your specific planning application (e.g., BPC, SAC) for any additional configuration steps.
    5. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Currency Types: Understand the different types of currencies used in SAP (e.g., local currency, group currency, transaction currency) and how they affect planning.
    • Currency Conversion: Familiarize yourself with how currency conversion works in SAP, including the use of exchange rates and conversion methods.
    • Planning Applications: If you are using specific SAP planning applications, refer to their user guides for detailed instructions on handling currency-related issues.

    By following these steps, you should be able to identify the cause of the AO_PLANNING027 error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant