Do you have any question about this error?
Message type: E = Error
Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S
Message number: 024
Message text: Transfer of plan vals not possible - different object currency on WBS &3
WBS element &v3& has object currency &v4& and appropriation request
&v1& has object currency &v2&.
The WBS element is assigned.
However, transferring plan values later is not possible due to the
differing object currencies.
If you want to transfer plan values from the appropriation request to
the WBS element, ensure that they both have the same object currency.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
AO_PLANNING024
- Transfer of plan vals not possible - different object currency on WBS &3 ?The SAP error message AO_PLANNING024 indicates that there is a mismatch in the currency settings between the Work Breakdown Structure (WBS) element and the planning values you are trying to transfer. Specifically, this error occurs when the currency of the planning values does not match the currency of the WBS element.
Cause:
- Currency Mismatch: The WBS element is defined in a specific currency (e.g., EUR, USD), and the planning values you are trying to transfer are in a different currency.
- Configuration Issues: There may be configuration settings in the project system or controlling area that lead to this mismatch.
- Data Entry Errors: Incorrect data entry during the planning process can lead to this error.
Solution:
Check Currency Settings:
- Verify the currency settings of the WBS element. You can do this by navigating to the WBS element in the project system and checking its attributes.
- Ensure that the planning values you are trying to transfer are in the same currency as the WBS element.
Convert Currencies:
- If the planning values are in a different currency, you may need to convert them to match the WBS currency before attempting the transfer again.
Adjust Planning Values:
- If the planning values are incorrect, adjust them to ensure they align with the WBS currency.
Review Configuration:
- Check the configuration settings in the project system and controlling area to ensure that they are set up correctly for currency handling.
Consult Documentation:
- Refer to SAP documentation or help resources for further guidance on handling currency issues in project planning.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems.
Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING023
Different object currency on order &3 - plan value transfer not possible
What causes this issue? Order &v3& has object currency &v4& and appropriation request &v1& has object currency &v2&.S...
AO_PLANNING022
Transfer of plan values not possible due to different object currency
What causes this issue? Appropriation request &v1& has a different object currency (&v2&) than order &v3& (&v4&). Tra...
AO_PLANNING025
Currency changed from &1 to &2 - only display is possible
What causes this issue? Appropriation request &v3& belongs to appropriation request type &v4&. You are only allowed to plan appropria...
AO_PLANNING026
Currency changed from &1 to &2 - only display is possible
What causes this issue? Appropriation request &v3& belongs to appropriation request type &v4&. You are only allowed to plan appropria...