Do you have any question about this error?
Message type: E = Error
Message class: AO_PLANNING - Message Class for Project WGRS-4B4R6S
Message number: 014
Message text: Cash flow in year &1 exceeds maximum amount
In year &V1&, the cash flow exceeds the maximum number of pre-decimal
places (&V2&) after the translation from &V3& to &V4&. The maximum
allowed number of pre-decimal places in the planning table is based on
the currency-specific number of decimal places and the scaling factor
that you entered in the planning profile.
It is not possible to transfer the plan values.
Adjust the plan values, so that the difference between revenue and
costs does not exceed &V2& pre-decimal places.
Error message extract from SAP system. Copyright SAP SE.
AO_PLANNING014
- Cash flow in year &1 exceeds maximum amount ?The SAP error message AO_PLANNING014, which states "Cash flow in year &1 exceeds maximum amount," typically occurs in the context of cash flow planning or financial planning within the SAP system. This error indicates that the cash flow amount for a specific year exceeds the predefined maximum limit set in the system.
Cause:
- Exceeding Limits: The cash flow amount entered for the specified year exceeds the maximum allowable limit defined in the system settings.
- Configuration Settings: The maximum cash flow limits may be configured in the system based on business rules or regulatory requirements.
- Data Entry Errors: There may be a mistake in the data entry, leading to an incorrect cash flow amount being inputted.
Solution:
Review Configuration: Check the configuration settings for cash flow planning in the SAP system. This may involve reviewing the maximum cash flow limits set for the relevant planning area or fiscal year.
- Navigate to the relevant configuration transaction (e.g., SPRO) and check the settings under Financial Accounting or Controlling.
Adjust Cash Flow Amount: If the cash flow amount entered is indeed too high, adjust it to a value that is within the allowable limits.
- Ensure that the cash flow figures are realistic and align with the organization's financial planning.
Consult Documentation: Review any documentation or guidelines provided by your organization regarding cash flow planning to ensure compliance with internal policies.
Check for Data Entry Errors: Verify that the data entered is correct and does not contain any typographical errors or miscalculations.
Contact SAP Support: If the issue persists and you believe the configuration is correct, consider reaching out to SAP support for further assistance. They may provide insights into specific configurations or patches that could resolve the issue.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING013
Sum of overhead and investment costs exceeds maximum in year &1
What causes this issue? The total of investment costs and overhead costs entered in the year &V1& exceeds the maximum number of allowed place...
AO_PLANNING012
Internal field overflow: delete revenue and save
What causes this issue? Text copied from message AO_PLANNING 010 During the update of the change document, the system internally identifies the diffe...
AO_PLANNING015
Sum of overhead costs exceeds maximum in year &1 due to entry
What causes this issue? As the result of entering overhead costs in year &V1&, the cumulative overhead costs exceed the maximum number of pre...
AO_PLANNING016
Sum of investment costs too large in year &1 due to entry
What causes this issue? As the result of entering investment costs in year &V1&, the cumulative investment costs exceed the maximum number of...
Click on this link to search all SAP messages.