Message text: Sum of overhead and investment costs exceeds maximum in year &1
The total of investment costs and overhead costs entered in the year
&V1& exceeds the maximum number of allowed places before the decimal
place (&V2&) after currency translation from &V3& to &V4&.
The maximum allowed number of places before the decimal place in the
planning table is based on the currency-specific number of decimal
places and the scaling factor entered in the plan profile.
Transferring the plan values is not possible.
Modify the plan values so that the total of investment and overhead
costs does not exceed &V2& pre-decimal places.
Error message extract from SAP system. Copyright SAP SE.
AO_PLANNING013
- Sum of overhead and investment costs exceeds maximum in year &1 ?The SAP error message AO_PLANNING013 indicates that the sum of overhead and investment costs for a specific year exceeds the maximum allowable limit defined in the system. This error typically occurs in the context of planning and budgeting within SAP's Asset Accounting or Project System modules.
Cause:
- Exceeding Limits: The primary cause of this error is that the total of overhead and investment costs for a given year surpasses the predefined maximum limit set in the system configuration.
- Configuration Settings: The maximum limits for costs may be configured in the system based on business rules or financial regulations.
- Data Entry Errors: Incorrect data entry or miscalculations in the planning process can lead to inflated cost figures.
- Changes in Cost Structure: Changes in project scope, resource allocation, or cost estimation can also lead to exceeding the limits.
Solution:
- Review Cost Entries: Check the overhead and investment cost entries for the specified year. Ensure that all entries are accurate and necessary.
- Adjust Planning Figures: If the costs are indeed valid but exceed the limit, consider adjusting the planning figures to bring them within the allowable range.
- Modify Configuration: If the maximum limit is too restrictive for your business needs, consult with your SAP configuration team to review and potentially increase the maximum allowable costs in the system settings.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on how to adjust planning parameters or configuration settings.
- Error Logs: Check the error logs for additional details that may provide insights into the specific costs causing the issue.
Related Information:
CJ20N
(Project Builder) or KP06
(Cost Planning) to review and adjust planning data.By following these steps, you should be able to identify the cause of the AO_PLANNING013 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
AO_PLANNING012
Internal field overflow: delete revenue and save
What causes this issue? Text copied from message AO_PLANNING 010 During the update of the change document, the system internally identifies the diffe...
AO_PLANNING011
Internal field overflow: first delete investment costs and then save
What causes this issue? Text copied from message AO_PLANNING010 During the update of the change document, the system internally identifies the differ...
AO_PLANNING014
Cash flow in year &1 exceeds maximum amount
What causes this issue? In year &V1&, the cash flow exceeds the maximum number of pre-decimal places (&V2&) after the translation fro...
AO_PLANNING015
Sum of overhead costs exceeds maximum in year &1 due to entry
What causes this issue? As the result of entering overhead costs in year &V1&, the cumulative overhead costs exceed the maximum number of pre...
Click on this link to search all SAP messages.