How To Fix AO336 - Variant &3: Implementation start date &1 is after completion date &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: AO - Appropriation requests - Master data / Customizing

  • Message number: 336

  • Message text: Variant &3: Implementation start date &1 is after completion date &2

  • Show details Hide details
  • What causes this issue?

    Implementation start date &V1& that was entered is after the completion
    date &V2& of variant &V3&. The implementation start date always has to
    be before the completion date (&V2&).

    System Response

    The entry is not allowed.

    How to fix this error?

    Do one of the following:
    Correct implementation start date &V1& that you entered so that it is
    before or the same date as completion date &V2&.
    Correct completion date &V2&, so that it is after or the same date as
    implementation start date &V1&.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message AO336 - Variant &3: Implementation start date &1 is after completion date &2 ?

    The SAP error message AO336 indicates that there is a problem with the date settings for a variant in the Asset Accounting module. Specifically, the error states that the implementation start date is after the completion date, which is logically incorrect. Here’s a breakdown of the cause, solution, and related information for this error:

    Cause:

    1. Date Configuration Error: The implementation start date is set to a date that occurs after the completion date. This can happen due to manual entry errors or incorrect data migration.
    2. Data Migration Issues: If data was migrated from another system, the dates may not have been correctly aligned.
    3. Incorrect Variant Settings: The variant settings may have been configured incorrectly, leading to this inconsistency.

    Solution:

    1. Check the Dates: Review the implementation start date and completion date for the variant in question. Ensure that the implementation start date is earlier than the completion date.
    2. Correct the Dates: If the dates are incorrect, update the implementation start date or the completion date to ensure that the start date is before the completion date.
    3. Review Configuration: If this error occurs frequently, review the configuration settings for the asset variants to ensure that there are no systemic issues.
    4. Data Validation: If data was migrated, perform a validation check on the dates to ensure that they are logically consistent.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific instructions on how to adjust these settings in your version of SAP.

    Related Information:

    • Transaction Codes: You may need to use transaction codes such as AS01 (Create Asset), AS02 (Change Asset), or AS03 (Display Asset) to access and modify asset data.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • User Permissions: Ensure that you have the necessary permissions to make changes to asset data, as restrictions may prevent you from updating the dates.
    • Testing: After making changes, test the variant to ensure that the error no longer occurs and that the asset behaves as expected in the system.

    By following these steps, you should be able to resolve the AO336 error and ensure that your asset data is correctly configured.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant