Message type: E = Error
Message class: AO - Appropriation requests - Master data / Customizing
Message number: 260
Message text: Release is not possible since there is no measure - check
You want to release appropriation request &V1&. However, there are no
measures assigned to appropriation request &V1&.
Appropriation request type &V2& is set up so that the system
automatically replaces the appropriation request with the measure when
the appropriation request is released.
'Release' cannot be carried out.
Check whether the indicator 'replace by measure' is set correctly in
appropriation request type &V2&.
Or, before you release the appropriation request
Assign a measure to appropriation request &V1& on the 'Measures'
screen.
Or create a measure (order or WBS element) directly from the
appropriation request on the 'Measures' screen.
Error message extract from SAP system. Copyright SAP SE.
AO260
- Release is not possible since there is no measure - check ?The SAP error message AO260 ("Release is not possible since there is no measure - check") typically occurs in the context of SAP's Analytical Accounting or Profitability Analysis (CO-PA) modules. This error indicates that a release process cannot be completed because there are no measures (data points or metrics) associated with the transaction or document you are trying to process.
Causes:
- Missing Measures: The primary cause of this error is that the document or transaction you are trying to release does not have any associated measures. Measures are essential for the system to perform calculations or analyses.
- Incorrect Configuration: There may be configuration issues in the settings for the relevant controlling area, profit center, or other related settings that prevent measures from being assigned.
- Data Entry Errors: There could be errors in data entry that lead to the absence of measures in the document.
- Inconsistent Data: If the data in the system is inconsistent or incomplete, it may lead to this error.
Solutions:
- Check Document for Measures: Review the document or transaction you are trying to release to ensure that it has the necessary measures assigned. You can do this by navigating to the relevant transaction and checking the details.
- Review Configuration Settings: Ensure that the configuration settings for the controlling area, profit center, and other relevant settings are correctly set up to allow for measures to be assigned.
- Data Entry Verification: Verify that all required fields were filled out correctly during data entry. If any required fields are missing, complete them and try the release again.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the configuration and requirements for measures in your version of SAP.
- Check for Updates or Notes: Sometimes, SAP releases notes or updates that address specific issues. Check the SAP Support Portal for any relevant notes that might pertain to this error.
- Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
KOB1
(for displaying actual line items) or KSB1
(for displaying cost center reports) to analyze the data.By following these steps, you should be able to identify the cause of the AO260 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
AO259
Transfer of plan values not possible - there are more than 2 measures
What causes this issue? You want to transfer plan values to a measure. However, there are more than two measures assigned to this appropriation reque...
AO258
No plan values exist for combined costs or revenue
What causes this issue? There are no plan values for combined costs, nor are there plan values for revenue. Therefore, the system cannot calculate pr...
AO261
Project definition &2 is being processed by user &1
What causes this issue? Project definition &V2& is blocked by user &V1&. Therefore, appropriation request &V2&, which belongs...
AO262
Combined costs are negative
What causes this issue? The investment costs are greater than the combined costs. This is not allowed, since the investment costs are supposed to be ...