Message type: E = Error
Message class: AO - Appropriation requests - Master data / Customizing
Message number: 084
Message text: Project definition &1 was activated --> Detailed information
The system activates project definition &V1& that is assigned to
appropriation request &V1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can now create the top WBS element for this project from within the
appropriation request. This top WBS element is assigned as the measure
that will be implemented. The system uses the same WBS element ID &V1&
as in the project. When you do this, the system automatically adopts
certain fields and the overall cost planning.
After you save, you can set up the WBS hierarchy in the PS (Project
System) component.
Another option: you can define the WBS structure in the PS component by
hand, and then assign the top WBS element to the appropriation request
as the measure that will be implemented.
Error message extract from SAP system. Copyright SAP SE.
AO084
- Project definition &1 was activated --> Detailed information ?The SAP error message AO084 indicates that there is an issue related to the activation of a project definition in the SAP system. This error typically occurs in the context of Project System (PS) or Controlling (CO) modules when trying to activate a project definition that has not been properly configured or has missing information.
Cause: The error message AO084 can be triggered by several factors, including: Incomplete Project Definition: The project definition may be missing required fields or configurations. Invalid Status: The project might be in a status that does not allow activation. Missing Master Data: Related master data (like WBS elements, networks, etc.) may not be created or activated. Authorization Issues: The user may not have the necessary authorizations to activate the project. System
Configuration Issues: There may be configuration settings in the system that prevent the activation of the project.
Solution: To resolve the AO084 error, you can follow these steps: Check Project Definition: Go to the
Get instant SAP help. Sign up for our Free Essentials Plan.
AO083
Partner dtrm. proc. &1 for approp. requests does not exist
What causes this issue? Partner determination procedure &V1& is not defined.System Response The entry is rejected.How to fix this error? Ch...
AO082
Partner function &1 not defined in partner detrm. proc. &2
What causes this issue? Partner function &V1& is not defined in partner determination procedure &V2&.System Response The entry is re...
AO085
Project definition &1 was not activated - inform your system administ.
What causes this issue? You want to activate project definition &V1&. The system could not execute this function.System Response The system ...
AO086
Maintain an order type for creating the order
What causes this issue? You selected the 'create order' function for appropriation request &V1& . However, no order type is defined...
Click on this link to search all SAP messages.