Do you have any question about this error?
Message type: E = Error
Message class: AJ - Billing program
Message number: 089
Message text: Specify a date starting from &1 as the extrapolation date
You have specified &v2& as the extrapolation date. This date is before
the start of the next billing period (&v1&) for the contract.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Specify an extrapolation date which is after the start of the billing
period (&v1&) for the contract.
Error message extract from SAP system. Copyright SAP SE.
AJ089
- Specify a date starting from &1 as the extrapolation date ?The SAP error message AJ089, which states "Specify a date starting from &1 as the extrapolation date," typically occurs in the context of the SAP system when dealing with planning or forecasting data, particularly in the area of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).
Cause:
This error message is triggered when the system expects an extrapolation date to be specified, but the date provided does not meet the required criteria. The placeholder
&1
usually represents a specific date that is the minimum date allowed for extrapolation. This could happen due to:
- Incorrect Date Input: The date entered is earlier than the minimum date allowed for extrapolation.
- Configuration Issues: The planning settings or configuration may not be set up correctly, leading to the system not recognizing the date as valid.
- Data Availability: There may not be sufficient historical data available for the specified date range to perform extrapolation.
Solution:
To resolve the AJ089 error, you can take the following steps:
Check the Date: Ensure that the date you are trying to use for extrapolation is on or after the date specified in the error message (
&1
). Adjust the date accordingly.Review Planning Settings: Verify the planning settings in your SAP system. Check if there are any restrictions or configurations that might be affecting the extrapolation date.
Data Validation: Ensure that there is sufficient historical data available for the period leading up to the extrapolation date. If there is insufficient data, consider extending the historical data range.
Consult Documentation: Refer to the SAP documentation or help files related to the specific module you are working with (e.g., IBP, APO) for more detailed information on extrapolation settings and requirements.
Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
/SAPAPO/SDP94
for demand planning.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
AJ088
Specify a date starting from &1 as the check date
What causes this issue? You have specified &v2& as the check date. This date is before the start of the next billing period (&v1&) fo...
AJ087
Contract &1 is blocked from automatic billing
What causes this issue? Contract &v1& is blocked from automatic billing; it can only be billed manually.System Response The system issues an...
AJ090
Specify a valid simulation period
What causes this issue? You have specified &v1& as the start date for the simulation period. However, this date is not before &v2&, w...
AJ091
Billing order for &1 cannot be processed
What causes this issue? You have attempted to process the billing order for date &v1& for installation &v2&. However, this is not pos...
Click on this link to search all SAP messages.