Message type: E = Error
Message class: AJ - Billing program
Message number: 088
Message text: Specify a date starting from &1 as the check date
You have specified &v2& as the check date. This date is before the
start of the next billing period (&v1&) for the contract.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Specify a check date which is after the start of the billing period (
&v1&) for the contract.
Error message extract from SAP system. Copyright SAP SE.
AJ088
- Specify a date starting from &1 as the check date ?The SAP error message AJ088, which states "Specify a date starting from &1 as the check date," typically occurs in the context of asset accounting or related financial transactions. This error indicates that the date you are trying to use for a specific operation (like asset retirement, transfer, or depreciation) is earlier than the date specified in the system, which is represented by &1.
Cause: Date Constraints: The date you are trying to enter is before the earliest date allowed by the system for the operation you are performing. This could be due to various reasons, such as: The asset has not been created or activated yet. The fiscal year has been closed, and transactions cannot be posted to that period. The asset's useful life or depreciation start date is set to a later date. Configuration Settings: The system may have specific settings that restrict transactions to certain periods or dates.
Solution: Check the Date: Ensure that the
Get instant SAP help. Sign up for our Free Essentials Plan.
AJ087
Contract &1 is blocked from automatic billing
What causes this issue? Contract &v1& is blocked from automatic billing; it can only be billed manually.System Response The system issues an...
AJ086
Not possible to update operand &1 to the installation facts
What causes this issue? In billing, values were calculated for operand &v1& that are to be updated in the installation facts. In this case, t...
AJ089
Specify a date starting from &1 as the extrapolation date
What causes this issue? You have specified &v2& as the extrapolation date. This date is before the start of the next billing period (&v1&...
AJ090
Specify a valid simulation period
What causes this issue? You have specified &v1& as the start date for the simulation period. However, this date is not before &v2&, w...
Click on this link to search all SAP messages.