Do you have any question about this error?
Message type: E = Error
Message class: ACRSL - Messages for Depreciation Keys and Calculation Methods
Message number: 017
Message text: Base method &: set 'depreciation after end of planned life' indicator
You selected 'depreciation below net book value zero' and/or 'curb.'
Each of these settings are allowed only if you also set the
'depreciation after planned life end' indicator.
The data is not saved.
Correct your entries, or set the above indicator.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
ACRSL017
- Base method &: set 'depreciation after end of planned life' indicator ?The SAP error message ACRSL017 typically occurs in the context of Asset Accounting (FI-AA) when there is an issue related to the depreciation settings of an asset. Specifically, this error indicates that the system is expecting a certain configuration regarding the "depreciation after end of planned life" indicator for an asset, but it has not been set correctly.
Cause:
The error message ACRSL017 is triggered when:
To resolve this error, you can follow these steps:
Check Asset Master Data:
Set the Indicator:
Save Changes:
Re-run the Depreciation Calculation:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in Asset Accounting for further assistance.
Get instant SAP help. Start your 7-day free trial now.
ACRSL016
& : Dep. after planned life end incompatible with dep. over rem. life
What causes this issue? A depreciation method over the remaining useful life is only mathematically logical during the useful life of the asset. Tran...
ACRSL015
&3: Percentage rate required for depreciation calculation method &1
What causes this issue? You have to enter at least one percentage rate in multi-level method &v2&. This is required in combination with depre...
ACRSL018
& : Check the treatment after the end of useful life
What causes this issue? In multi-level method &v3&, you entered acquisition value or replacement value as the base value. For these base valu...
ACRSL019
& : Validity in periods has to be between 0 and 12
What causes this issue? The planned life in periods is not between 0 and 12. You have to enter a valid calendar month.System Response The data is no...
Click on this link to search all SAP messages.