Do you have any question about this error?
Message type: E = Error
Message class: ACEPS - Fehlermeldungen Abgrenzungsbuchungen
Message number: 062
Message text: First carry out a normal run in company code &1
You want to carry out an accrual run with the run type "unplanned" in
company code &V1& for key date &V2&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Before doing this, hoever, you have to carry out a run for this key
date with run type "normal".
Error message extract from SAP system. Copyright SAP SE.
ACEPS062
- First carry out a normal run in company code &1 ?The SAP error message ACEPS062, which states "First carry out a normal run in company code &1," typically occurs in the context of the Asset Accounting (FI-AA) module when you are trying to execute a specific process (like a depreciation run or asset transfer) without having completed the necessary preliminary steps.
Cause:
The error indicates that a prerequisite action has not been completed. Specifically, it suggests that you need to perform a "normal run" for the specified company code before you can proceed with the action you are attempting. This could mean that you need to run a depreciation calculation or another relevant process that is required to be completed first.
Solution:
To resolve this error, follow these steps:
Identify the Company Code: Check the company code mentioned in the error message (represented by &1).
Perform the Normal Run:
- Navigate to the appropriate transaction for the normal run that needs to be executed. This is often done through transaction codes like:
- AFAB for running the depreciation program.
- ABAON for asset transfers.
- Ensure that you select the correct parameters and execute the normal run for the specified company code.
Check for Errors: After performing the normal run, check for any errors or warnings that may have occurred during the process. Address any issues that arise.
Retry the Original Action: Once the normal run has been successfully completed, attempt to execute the original action that triggered the ACEPS062 error again.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any specific patches or updates related to this error message.
Get instant SAP help. Start your 7-day free trial now.
ACEPS061
Processing not possible on &1 - fiscal year &2 not carried forward
What causes this issue? Processing terminated, as date &V1& in company code &V3& falls in a future fiscal year.System Response The s...
ACEPS060
Processing not possible on &1 - fiscal year &2 already completed
What causes this issue? Processing has been terminated, as date &V1& in company code &V3& falls in a fiscal year that has already bee...
ACEPS063
Postings made for years in the past - see long text!
What causes this issue? In the posting that you have started in the Accrual Engine, postings are made in fiscal years in the past.System Response Th...
ACEPS064
First carry out a run for &3 in company code &1
What causes this issue? You are trying to perform an accrual run in company code &V1& for key date &V2&.System Response According to...
Click on this link to search all SAP messages.