How To Fix 9J384 - The "complete month" indicator is compulsory with settlement type 2 or 4


9J384 - Overview

  • Message type: E = Error

  • Message class: 9J -

  • Message number: 384

  • Message text: The "complete month" indicator is compulsory with settlement type 2 or 4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 9J384 - The "complete month" indicator is compulsory with settlement type 2 or 4 ?
    The SAP error message 9J384 indicates that when using settlement types 2 (periodic settlement) or 4 (final settlement), the "complete month" indicator must be set. This error typically arises in the context of settlement processes in SAP, particularly in modules like Project System (PS) or Controlling (CO).
    
    Cause: The error occurs because the system requires the "complete month" indicator to be activated when performing settlements with the specified settlement types. This is a validation rule in SAP to ensure that the settlement process is correctly aligned with the accounting periods.
    Solution: To resolve this error, you need to ensure that the "complete month" indicator is set correctly in the relevant configuration or during the settlement process. Here are the steps to do this: Check Settlement Profile: Go to the configuration settings for the settlement profile used in your project or cost object. Ensure that the "complete month" indicator is activated for the settlement types 2 and 4. Adjust

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author