Do you have any question about this error?
Message type: E = Error
Message class: 9J -
Message number: 228
Message text: Loading costs cannot be incurred when you change the activity type
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
9J228
- Loading costs cannot be incurred when you change the activity type ?The SAP error message 9J228, which states "Loading costs cannot be incurred when you change the activity type," typically occurs in the context of cost accounting and activity management within SAP. This error indicates that there is an issue with the way costs are being allocated or processed when an activity type is changed.
Cause:
Activity Type Change: The error is triggered when there is an attempt to change the activity type of a cost object (like a production order or internal order) after costs have already been posted against it. SAP does not allow changes to the activity type if costs have been incurred, as this could lead to inconsistencies in cost allocation and reporting.
Cost Allocation Rules: The system has specific rules regarding how costs are allocated based on activity types. Changing the activity type after costs have been incurred can violate these rules.
Configuration Issues: There may be configuration settings in the controlling area or activity type settings that are not aligned with the intended use of the activity types.
Solution:
Avoid Changing Activity Types: If costs have already been posted, avoid changing the activity type. Instead, consider creating a new activity type if necessary.
Reverse Cost Postings: If you must change the activity type, you may need to reverse any cost postings related to the current activity type before making the change. This can be done through transaction codes like KB11N (Manual Repost of Costs) or KSV5 (Repost Costs).
Check Configuration: Review the configuration settings for the activity types in the controlling area. Ensure that the settings align with your business processes and that they allow for the intended changes.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling activity types and cost postings.
Seek Help from SAP Support: If the issue persists or if you are unsure about the steps to take, consider reaching out to SAP support or your internal SAP team for assistance.
Related Information:
By understanding the cause and following the suggested solutions, you can effectively address the error message 9J228 in SAP.
Get instant SAP help. Start your 7-day free trial now.
9J227
Function not allowed for item as it has been changed (see: long text)
What causes this issue? You are trying to assign a status (for example, delete logically) to an existing item that you have changed. Howver, you cann...
9J226
You must make at least two entries from personnel no./recipient/equipment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
9J229
Only the following value(s) are allowed: & & & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
9J230
End of measuring point (&1) is before start of measuring point (&2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.