How To Fix 9J142 - Activity type is not relevant to document


9J142 - Overview

  • Message type: E = Error

  • Message class: 9J -

  • Message number: 142

  • Message text: Activity type is not relevant to document

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 9J142 - Activity type is not relevant to document ?
    The SAP error message 9J142: Activity type is not relevant to document typically occurs in the context of controlling (CO) and project systems (PS) when there is an attempt to post an activity allocation or a cost allocation that involves an activity type that is not configured to be used with the specific document or transaction.
    Causes:
    
    Activity Type Configuration: The activity type you are trying to use may not be configured for the specific cost center, internal order, or project you are working with.
    Document Type Restrictions: The document type you are using may not allow the posting of the specified activity type.
    Master Data Issues: The master data for the cost center, internal order, or project may not be set up correctly to include the activity type.
    Authorization Issues: There may be authorization restrictions preventing the use of the activity type in the current context.
    
    Solutions:
    
    
    Check Activity Type Configuration:
    
    Go to the configuration settings for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker