Message type: E = Error
Message class: 6A - Real estate messages rent adjustment
Message number: 524
Message text: Actual data of mod.measure "&" unchanged; new calculation not necessary.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
6A524
- Actual data of mod.measure "&" unchanged; new calculation not necessary. ?The SAP error message 6A524 indicates that the actual data for a particular modular measure (mod.measure) has not changed, and therefore, a new calculation is not necessary. This message typically arises in the context of SAP's Controlling (CO) module, particularly when dealing with actual data postings and calculations related to cost centers, internal orders, or other controlling objects.
Cause: No Changes in Data: The most common cause of this error is that the actual data for the specified modular measure has not changed since the last calculation. This can happen if: No new postings have been made to the cost center or internal order. The data being processed is identical to the previous data. Incorrect Configuration: There may be issues with the configuration of the controlling area or the specific modular measure that is being calculated. Timing Issues: If the calculation is being triggered too soon after a posting, the system may not have had enough
Get instant SAP help. Sign up for our Free Essentials Plan.
6A523
No adjustment run exists for modernization measure "&"
What causes this issue? Having changed the actual data for construction measure "&v1&", you now want to update the related adjustme...
6A522
BE & RU &: Actual data for construction measure '&' missing
What causes this issue? You want to activate a rent adjustment due to a structural measure. This requires that the actual measure data (and not only ...
6A525
Adjustment run & & already exists for measure &
What causes this issue? You want to carry out a rent adjustment based on the construction measure &V1&. The adjustment run &V2 &V3&am...
6A526
Existing adjustment run & & updated
What causes this issue? You want to carry out a rent adjustment run on the basis of a construction measure. An adjustment run with the identification...
Click on this link to search all SAP messages.