Message type: E = Error
Message class: 6A - Real estate messages rent adjustment
Message number: 522
Message text: BE & RU &: Actual data for construction measure '&' missing
You want to activate a rent adjustment due to a structural measure.
This requires that the actual measure data (and not only planned data)
is maintained in the master data, and that the rent adjustment has been
calculated on the basis of these actual values.
In this case, no actual data has been maintained, and the rent
adjustment run was not recalculated with actual data.
Maintain the actual data for the structural measure as required, and
start the adjustment run again.
Error message extract from SAP system. Copyright SAP SE.
6A522
- BE & RU &: Actual data for construction measure '&' missing ?The SAP error message 6A522 indicates that there is missing actual data for a construction measure in the system. This error typically arises in the context of project system (PS) or construction-related modules where actual costs or data entries are expected for specific construction measures or activities.
Cause:
Missing Actual Data: The primary cause of this error is that the system is unable to find any actual data (like costs, hours, etc.) for the specified construction measure. This could be due to:
- No postings have been made against the construction measure.
- Data was not entered correctly or was deleted.
- The construction measure is not yet activated or is in a status that does not allow for data entry.
Incorrect Configuration: There may be configuration issues in the project system or construction module that prevent the system from recognizing the actual data.
Data Entry Errors: Users may have entered data incorrectly, leading to discrepancies in the expected data.
Solution:
Check Actual Data: Verify if any actual data has been posted for the construction measure in question. You can do this by:
- Navigating to the relevant project or construction measure in the SAP system.
- Checking the actual costs or hours posted against that measure.
Post Missing Data: If actual data is indeed missing, you will need to enter the required data. This could involve:
- Posting actual costs or hours through the appropriate transaction codes (e.g., CJ20N for project management).
- Ensuring that the data is entered in the correct format and for the correct period.
Review Configuration: If the issue persists, review the configuration settings for the project system or construction module to ensure that everything is set up correctly. This may involve:
- Checking the settings for construction measures.
- Ensuring that the project structure is correctly defined.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error message. This can provide insights into common issues and resolutions.
Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide assistance based on your specific system configuration and setup.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Sign up for our Free Essentials Plan.
6A521
Actual data of "&" incomplete; New calculation not possible
What causes this issue? You want to carry out a rent adjustment due to a modernization measure for which there is already a settlement run. This only...
6A520
Actual data of "&" unchanged; No new calculation required
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6A523
No adjustment run exists for modernization measure "&"
What causes this issue? Having changed the actual data for construction measure "&v1&", you now want to update the related adjustme...
6A524
Actual data of mod.measure "&" unchanged; new calculation not necessary.