Do you have any question about this error?
Message type: E = Error
Message class: 6A - Real estate messages rent adjustment
Message number: 525
Message text: Adjustment run & & already exists for measure &
You want to carry out a rent adjustment based on the construction
measure &V1&. The adjustment run &V2 &V3&, however, has already been
generated for this measure.
Since you can only use a construction measure once to perform a rent
adjustment, you cannot create another run.
However, you can update an existing run if it was generated on the
basis of planning data and if the actual data was maintained
subsequently for the construction measure. In this case, please use the
same adjustment run identification (that is, &V2&, &V3&).
If the run was already generated based on the actual data, you must
cancel it first before you can use the measure again.
Error message extract from SAP system. Copyright SAP SE.
6A525
- Adjustment run & & already exists for measure & ?The SAP error message "6A525 Adjustment run & & already exists for measure &" typically occurs in the context of SAP's Controlling (CO) module, particularly when dealing with adjustments in cost accounting or internal orders. This error indicates that there is an attempt to create an adjustment run that already exists for a specific measure, which can lead to conflicts or inconsistencies in the data.
Cause:
- Duplicate Adjustment Run: The most common cause of this error is that an adjustment run with the same parameters (e.g., measure, period, etc.) has already been executed or is currently in process.
- Incorrect Configuration: There may be issues with the configuration of the adjustment runs or the measures involved.
- Data Integrity Issues: There could be data integrity issues in the database that are causing the system to believe that an adjustment run already exists.
Solution:
Check Existing Adjustment Runs:
- Go to the relevant transaction (e.g., KSU5 for adjustment runs) and check if an adjustment run with the same parameters already exists. If it does, you may need to either delete it or use it instead of creating a new one.
Review Parameters:
- Ensure that the parameters you are using to create the adjustment run are unique and do not conflict with existing runs.
Delete or Modify Existing Runs:
- If you find that an adjustment run is indeed present and is not needed, you can delete it. Be cautious with this step, as it may affect financial reporting and data integrity.
Consult Documentation:
- Review SAP documentation or help files related to adjustment runs and measures to ensure that you are following the correct procedures.
Check for Locks:
- Sometimes, the error can occur if there are locks on the data. Ensure that no other processes are currently using the same measure or adjustment run.
Contact SAP Support:
- If the issue persists and you cannot identify the cause, consider reaching out to SAP support for assistance. They may provide insights specific to your system configuration.
Related Information:
By following these steps, you should be able to resolve the error and successfully manage your adjustment runs in SAP.
Get instant SAP help. Start your 7-day free trial now.
6A524
Actual data of mod.measure "&" unchanged; new calculation not necessary.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6A523
No adjustment run exists for modernization measure "&"
What causes this issue? Having changed the actual data for construction measure "&v1&", you now want to update the related adjustme...
6A526
Existing adjustment run & & updated
What causes this issue? You want to carry out a rent adjustment run on the basis of a construction measure. An adjustment run with the identification...
6A527
Existing adjustment run & & cannot be changed
What causes this issue? You want to perform a rent adjustment on the basis of a construction measure using the identification &V1& &V2&am...
Click on this link to search all SAP messages.