Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 314
Message text: Planning run with scope of planning. Delete scope of plng for plant plng
As a scope of planning has been entered for the total planning run, the
additional entry of a plant has been ignored.
To plan the plant, delete the entry for the scope of planning.
Error message extract from SAP system. Copyright SAP SE.
61314
- Planning run with scope of planning. Delete scope of plng for plant plng ?The SAP error message 61314, which states "Planning run with scope of planning. Delete scope of plng for plant plng," typically occurs in the context of SAP's Advanced Planning and Optimization (APO) or similar planning modules. This error indicates that there is an issue with the planning scope defined for a specific plant.
Cause:
- Invalid Planning Scope: The planning scope defined for the plant may not be valid or may not exist. This can happen if the planning scope was deleted or not properly configured.
- Configuration Issues: There may be configuration issues in the planning area or the planning book that are causing the system to not recognize the planning scope.
- Data Inconsistencies: There could be inconsistencies in the master data or transaction data that are affecting the planning run.
Solution:
Check Planning Scope: Verify the planning scope assigned to the plant in the planning area. Ensure that the planning scope exists and is correctly configured.
- Navigate to the relevant configuration in SAP APO (e.g., transaction
/SAPAPO/SDP94
for planning book).- Check the settings for the planning area and ensure that the planning scope is correctly defined.
Delete or Adjust Planning Scope: If the planning scope is not needed or is incorrect, you may need to delete or adjust it.
- You can do this in the configuration settings for the planning area or planning book.
- Ensure that any changes made are consistent with the overall planning strategy.
Reconfigure Planning Area: If necessary, reconfigure the planning area to ensure that it aligns with the requirements of the planning process.
- This may involve redefining key figures, planning levels, and other relevant settings.
Check Master Data: Ensure that all relevant master data (e.g., materials, plants, resources) is correctly set up and consistent with the planning scope.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring planning scopes and areas.
Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
/SAPAPO/SDP94
(for planning book) and /SAPAPO/MC62
(for planning area).By following these steps, you should be able to resolve the error message 61314 and successfully execute your planning run.
Get instant SAP help. Start your 7-day free trial now.
61313
Capacity has already been planned for the order
What causes this issue? The planned order has already been scheduled in capacity planning. If the planned order has been changed, the capacity planni...
61312
Plant / MRP area does not exist in scope of planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61315
Planning file (DBVM) is empty
What causes this issue? The planning run cannot be carried out as the planning file DBVM is empty. No materials have yet been created for the materia...
61316
Selected scope of planning &1 is empty
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.