Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 312
Message text: Plant / MRP area does not exist in scope of planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61312
- Plant / MRP area does not exist in scope of planning ?The SAP error message 61312, "Plant / MRP area does not exist in scope of planning," typically occurs in the context of Material Requirements Planning (MRP) when the system cannot find the specified plant or MRP area in the planning scope. This can happen for various reasons, and understanding the cause is essential for resolving the issue.
Causes:
- Incorrect Plant/MRP Area Configuration: The plant or MRP area you are trying to use may not be correctly configured in the system or may not exist in the planning scope.
- Planning Scope Settings: The planning scope may not include the specified plant or MRP area. This can happen if the planning scope is limited to certain plants or areas.
- Master Data Issues: The material master data may not be set up correctly for the specified plant or MRP area.
- MRP Type Settings: The MRP type assigned to the material may not be compatible with the planning scope.
- Authorization Issues: The user may not have the necessary authorizations to access the specified plant or MRP area.
Solutions:
Check Plant/MRP Area Configuration:
- Go to the configuration settings in SAP and verify that the plant and MRP area are correctly defined.
- Ensure that the plant is active and not in a status that would prevent planning.
Review Planning Scope:
- Check the planning scope settings in the MRP configuration (transaction code: OMD0 or similar).
- Ensure that the plant and MRP area are included in the planning scope.
Verify Material Master Data:
- Use transaction code MM03 to check the material master data for the specific plant and MRP area.
- Ensure that the relevant data (such as MRP views) is correctly maintained.
Check MRP Type:
- Review the MRP type assigned to the material and ensure it is appropriate for the planning process you are executing.
Authorization Check:
- Ensure that the user executing the MRP run has the necessary authorizations to access the specified plant and MRP area.
Run MRP for Specific Plant:
- If you are running MRP for multiple plants, try running it for a single plant to isolate the issue.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
61311
No planned independent requirements maintained for material
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61310
The order was already checked according to ATP logic
What causes this issue? The order has already been checked using the ATP logic. The requested availability check for the planned independent requirem...
61313
Capacity has already been planned for the order
What causes this issue? The planned order has already been scheduled in capacity planning. If the planned order has been changed, the capacity planni...
61314
Planning run with scope of planning. Delete scope of plng for plant plng
What causes this issue? As a scope of planning has been entered for the total planning run, the additional entry of a plant has been ignored.How to f...