Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 254
Message text: Storage location '&' for material '&' in MRP area '&' planned separately
A storage location is defined in the material master as being planned
separately. Additionally, the storage location is assigned to the
material via an MRP area.
A storage location can, however, either only be defined as a storage
location that is planned separately or it is assigned to a material as
an MRP area.
Change either the MRP indicator in the material master and therefore
you redefine the storage location so that it is not planned separately
or you delete the assignment of the material to the MRP area.
Error message extract from SAP system. Copyright SAP SE.
61254
- Storage location '&' for material '&' in MRP area '&' planned separately ?The SAP error message 61254 indicates that a specific storage location for a material in a given MRP (Material Requirements Planning) area is planned separately. This typically means that the system is set up to manage inventory and planning for that material in a way that is distinct from other materials or storage locations.
Cause:
- Separate Planning: The material is configured to be planned separately in the MRP area, which may not align with the expectations of the user or the overall planning strategy.
- Configuration Issues: There may be a configuration issue in the MRP area settings or the material master data that is causing the system to treat the storage location separately.
- MRP Area Settings: The MRP area may have been defined in such a way that it requires separate planning for certain materials or storage locations.
Solution:
- Check MRP Area Configuration: Review the configuration of the MRP area to ensure that it is set up correctly. You can do this by navigating to the MRP area settings in the SAP system.
- Material Master Data: Verify the material master data for the specific material and storage location. Ensure that the planning settings are appropriate and that the material is not inadvertently set to be planned separately.
- Adjust Planning Parameters: If separate planning is not required, consider adjusting the planning parameters for the material or the MRP area to allow for combined planning.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on MRP area settings and material planning.
- User Training: Ensure that users are trained on how to manage MRP areas and understand the implications of separate planning.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with an SAP specialist or support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
61253
You change only change & in single-level BOM/structure representation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61252
Deletion of & is only allowed in single-level BOM/structure representn
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61255
Error reading the BOM & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61256
Invalid unit of measure for components & &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.