Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 869
Message text: Master recipe without operations: planned order cannot be converted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
40869
- Master recipe without operations: planned order cannot be converted ?The SAP error message 40869, "Master recipe without operations: planned order cannot be converted," typically occurs when you attempt to convert a planned order into a production order, but the associated master recipe does not contain any operations. This can happen for several reasons, and understanding the cause is essential for finding a solution.
Cause: Missing Operations in Master Recipe: The master recipe linked to the planned order does not have any defined operations. Operations are necessary for the production process, and without them, the system cannot proceed with the conversion. Incorrect Master Recipe Assignment: The planned order may be linked to a master recipe that is not appropriate for the production process, or the wrong master recipe may have been selected.
Configuration Issues: There may be configuration issues in the production planning module that prevent the proper assignment of operations to the master recipe.
Solution: Check the Master Recipe: Go to the master recipe in the
Get instant SAP help. Sign up for our Free Essentials Plan.
40850
Enter at least one selection criterion
What causes this issue? You have not entered any selection criteria for process orders.System Response The system does not allow you to carry out a ...
40827
You cannot add an external process order in change mode
What causes this issue? You can only enter order numbers of existing orders.System Response The system issues an error message and will not allow yo...
40898
Control recipe destination &1: No process instruction exists
What causes this issue? No process instructions are defined for control recipe destination &V1& in the planning recipe or in the process orde...
40899
System does not support planned orders for process materials
What causes this issue? You want to convert a planned order created for a process material to a production order or process order. However, the Syste...
Click on this link to search all SAP messages.