Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 090
Message text: No approval: Mat. component list of planned order not identical to BOM
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
40090
- No approval: Mat. component list of planned order not identical to BOM ?The SAP error message 40090, "No approval: Mat. component list of planned order not identical to BOM," typically occurs in the context of production planning and material management. This error indicates that there is a discrepancy between the material components listed in the planned order and those defined in the Bill of Materials (BOM) for the corresponding product.
Cause:
- BOM Changes: The BOM for the material may have been changed after the planned order was created, leading to a mismatch.
- Incorrect Planned Order: The planned order may have been created with incorrect or outdated component information.
- Approval Process: The system may have an approval process in place that requires the planned order to match the BOM exactly before it can be approved.
- Configuration Issues: There may be configuration settings in the system that enforce strict checks on BOM and planned order consistency.
Solution:
- Review BOM: Check the BOM for the material in question to ensure it is correct and up to date. You can do this using transaction code CS03 (Display BOM).
- Check Planned Order: Review the planned order using transaction code CO03 (Display Planned Order) to see the components listed and compare them with the BOM.
- Update Planned Order: If the BOM has changed, you may need to update the planned order to reflect the current BOM. This can be done by:
- Deleting the planned order and creating a new one.
- Modifying the planned order if the system allows it.
- Approval Process: If there is an approval process in place, ensure that the necessary approvals are obtained after making any changes.
- Consult Documentation: Review any relevant documentation or guidelines related to the approval process and BOM management in your organization.
- System Configuration: If the issue persists, consult with your SAP Basis or configuration team to check if there are any specific settings that need to be adjusted.
Related Information:
By following these steps, you should be able to resolve the error and ensure that your planned orders are consistent with the BOMs.
Get instant SAP help. Start your 7-day free trial now.
40089
No approval: Follow-up material for component not in BOM
What causes this issue? The process order cannot be approved as an effective-out date has been maintained for one of the material components in the m...
40088
Classification not possible as batches have already been assigned
What causes this issue? You cannot classify this material component as a batch has already been assigned or batch determination has already been carr...
40091
No approval: Mat.status of component &1 does not allow use in proc. order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
40092
Invalid selection as process order requires approval
What causes this issue? The order type assigned to the process order you have selected specifies that the order requires approval. In process orders ...
Click on this link to search all SAP messages.