Message type: E = Error
Message class: 40 - Messages for Process Orders
Message number: 089
Message text: No approval: Follow-up material for component not in BOM
The process order cannot be approved as an effective-out date has been
maintained for one of the material components in the material master
and the follow-up material is not contained in the bill of material.
If required, you can approve the order in individual approval.
Error message extract from SAP system. Copyright SAP SE.
40089
- No approval: Follow-up material for component not in BOM ?The SAP error message 40089, "No approval: Follow-up material for component not in BOM," typically occurs in the context of production planning and material management. This error indicates that there is an issue with the bill of materials (BOM) for a specific component in a production order or a related process. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Missing BOM Entry: The follow-up material (the material that is supposed to replace or supplement the original component) is not included in the BOM for the production order.
- Approval Status: The follow-up material may not have the necessary approval status in the system, which means it cannot be used in production.
- Configuration Issues: There may be configuration settings in the system that prevent the use of unapproved materials in production processes.
- Material Master Data: The material master data for the follow-up material may not be correctly set up, leading to issues with its availability in the BOM.
Solutions:
- Check BOM: Verify that the follow-up material is correctly included in the BOM for the relevant production order. If it is missing, you may need to add it.
- Approval Process: Ensure that the follow-up material has gone through the necessary approval processes. If it hasn’t, you may need to initiate the approval workflow.
- Material Master Data: Review the material master data for the follow-up material to ensure it is correctly configured and active.
- Consult with Configuration Team: If the issue persists, consult with your SAP configuration team to check if there are any settings that need to be adjusted regarding the approval of materials.
- Transaction Codes: Use transaction codes like CS02 (Change BOM) or CS03 (Display BOM) to check and modify the BOM as needed.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it. If the problem continues, consider reaching out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
40088
Classification not possible as batches have already been assigned
What causes this issue? You cannot classify this material component as a batch has already been assigned or batch determination has already been carr...
40087
Function cannot be carried out for quantities in active ingredient units
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
40090
No approval: Mat. component list of planned order not identical to BOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
40091
No approval: Mat.status of component &1 does not allow use in proc. order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.