Message type: E = Error
Message class: 00 -
Message number: 896
Message text: Cusr: Project structure not defined in table 206
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
00896
- Cusr: Project structure not defined in table 206 ?The SAP error message "00896 Cusr: Project structure not defined in table 206" typically occurs in the context of project management within SAP, particularly when dealing with project structures in the Project System (PS) module. This error indicates that the system cannot find a defined project structure for the specified project in the relevant configuration table (table 206).
Cause: Missing Project Structure: The project structure for the specified project has not been defined in the system. Incorrect Configuration: The configuration settings for the project structure may not have been set up correctly. Data Inconsistency: There may be inconsistencies or missing entries in the relevant tables that manage project structures.
Solution: Define Project Structure: Go to the transaction code OPRJ (Project Definition) or CJ20N (Project Builder). Check if the project structure is defined for the project in question. If not, you will need to create or define it. Check Table 206: Use transaction code SE11 to access the Data Dictionary. Look for
Get instant SAP help. Sign up for our Free Essentials Plan.
00895
Cusr: No entry made
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
00894
Cusr: Project number length exceeded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
00897
Cusr: Length of a project level exceeded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
00898
Cusr: Maximum project level number exceeded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.