Do you have any question about this error?
Message type: E = Error
Message class: 00 -
Message number: 897
Message text: Cusr: Length of a project level exceeded
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
00897
- Cusr: Length of a project level exceeded ?The SAP error message "00897 Cusr: Length of a project level exceeded" typically occurs in the context of project management within SAP, particularly when dealing with structures like Work Breakdown Structures (WBS) or project definitions. This error indicates that the length of a project level (such as a WBS element) has exceeded the maximum allowed length defined in the system.
Cause:
- Exceeding Character Limit: Each project level in SAP has a predefined maximum character limit. If the name or identifier of a project level exceeds this limit, the error will be triggered.
- Configuration Settings: The maximum length for project levels can be configured in the system. If the configuration allows for a shorter length than what is being used, this error will occur.
- Data Entry Error: Sometimes, this error can arise from a simple data entry mistake where an overly long name or identifier is inadvertently entered.
Solution:
- Check Project Level Length: Review the project level names or identifiers you are trying to use. Ensure that they do not exceed the maximum length allowed by the system.
- Modify Project Level Names: If the names are too long, consider shortening them to fit within the allowed character limit.
- Review Configuration Settings: If you have access to system configuration, check the settings for project level lengths. If necessary, consult with your SAP Basis or configuration team to adjust the settings, but be cautious as this may have broader implications.
- Data Entry Validation: Implement validation checks in your data entry processes to prevent users from entering project level names that exceed the maximum length.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
00896
Cusr: Project structure not defined in table 206
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
00895
Cusr: No entry made
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
00898
Cusr: Maximum project level number exceeded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
00899
Cusr: No entry made
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.