Message class: MD - Material Requirements Planning (MRP)
Message number: 429
Message text: &1: &2 (U6)
In the individual segment (make-to-order planning, individual project
planning, or direct production or direct procurement), the total of
stock and receipts is greater than the requirements.
The reason for this is, for example, that the sales order quantity has
been reduced.
The exception message is set by the system as follows:
If stock alone is greater than the requirements in the individual
segment, the exception is displayed in the stock line.
If receipts are scheduled, the exception message is displayed for the
receipts that lie furthest in the future. Here, an exception message is
given to all receipts whose quantities (also partially) exceed the
requirements quantity.
On the details screen for the receipts, the system also displays the
required quantity, not needed to cover the requirement.
The exception message is displayed in the MRP list and in the
stock/requirements list.
Either the stock is to be reduced by stock transfer or the receipts
should be reduced.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
MD429
- &1: &2 (U6) ?Get instant SAP help. Start your 7-day free trial now.
MD428
&1: &2 (S9)
Was verursacht dieses Problem? The following reasons exist: Either a component of the planned order or production order entered is identical to the...
MD427
&1: &2 (P4)
Was verursacht dieses Problem? The production finish date calculated using the routing lies after the order finish date that was calculated using t...
MD430
&1: &2 (C1)
Was verursacht dieses Problem? The maximum release quantity of the source of supply for this receipt has been exceeded. In the quota file, you can ...
MD431
&1: &2 (S4)
Was verursacht dieses Problem? A phantom assembly could not be exploded in a BOM explosion for the planned order or the subcontracting purchase req...