Do you have any question about this error?
Message type: E = Error
Message class: MD - Material Requirements Planning (MRP)
Message number: 426
Message text: &1: &2 (P3)
In Customizing, no specification has been made to allow the adjustment
of the order start date to the production start date.
However, the production start date calculated using the routing lies
before the order start date calculated using the in-house processing
time in the material master record.
This could mean that the times in the material master record or in the
routing are incorrect. If the in-house processing time in the material
master record is too small, this may lead to material shortages.
This exception is displayed in the MRP list and in the current
stock/requirements list.
Check the times in the material master record and in the routing.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
MD426
- &1: &2 (P3) ?Get instant SAP help. Start your 7-day free trial now.
MD425
&1: &2 (P2)
Was verursacht dieses Problem? The system could not find a valid routing when scheduling via the routing or the routing is incorrect.Systemantwort ...
MD424
&1: &2 (P1)
Was verursacht dieses Problem? The scheduling data in the Customizing settings are not consistent for the material. Possible reasons, for example: ...
MD427
&1: &2 (P4)
Was verursacht dieses Problem? The production finish date calculated using the routing lies after the order finish date that was calculated using t...
MD428
&1: &2 (S9)
Was verursacht dieses Problem? The following reasons exist: Either a component of the planned order or production order entered is identical to the...