How To Fix MD425 - &1: &2 (P2)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 425

  • Message text: &1: &2 (P2)

  • Show details Hide details
  • Was verursacht dieses Problem?

    The system could not find a valid routing when scheduling via the
    routing or the routing is incorrect.

    Systemantwort

    This exception is displayed in the MRP list and the current
    stock/requirements list.

    Wie behebe ich diesen Fehler?

    Check the routing for all the scheduling levels set in Customizing.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler MD425 - &1: &2 (P2) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:
  • MD424 &1: &2 (P1)
    Was verursacht dieses Problem? The scheduling data in the Customizing settings are not consistent for the material. Possible reasons, for example: ...

  • MD423 &1: &2 (U5)
    Was verursacht dieses Problem? The planned available stock is greater than the maximum stock as specified by the range of coverage profile.Systeman...

  • MD426 &1: &2 (P3)
    Was verursacht dieses Problem? In Customizing, no specification has been made to allow the adjustment of the order start date to the production sta...

  • MD427 &1: &2 (P4)
    Was verursacht dieses Problem? The production finish date calculated using the routing lies after the order finish date that was calculated using t...

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant