MD41 - PdP - individuel - multiniveaux


SAP Transaction Code - Details

  • Transaction Code: MD41

    Description: PdP - individuel - multiniveaux

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Production > Production Planning > MPS > MPS > Single-Item, Multi-Level
    • Logistics > Production - Process > Production Planning > MPS > MPS > Single-Item, Multi-Level
  • Show technical details Hide technical details
    • Program: SAPMM61X

      Screen: 150

      Authorization Object:

    • Development Package: MD03

      Package Description: Application Devt ERP MPS/Deterministic Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MD41 - PdP - individuel - multiniveaux
     Create Planned Order
    
    Overview:
    The SAP transaction code MD41 is used to create a planned order for a single item in a multi-level environment. This transaction code is used to create a planned order for a single item in the material requirements planning (MRP) system. The planned order is created based on the material requirements planning data and the master production schedule (MPS). 
    
    Functionality: 
    The MD41 transaction code allows users to create a planned order for a single item in a multi-level environment. This transaction code is used to create a planned order based on the material requirements planning data and the master production schedule. The planned order is created with the necessary information such as quantity, start date, and finish date. The planned order can then be used to generate production orders or purchase orders. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code MD41 in the command field. 
    2. Enter the material number of the item for which you want to create a planned order. 
    3. Enter the quantity of the item that you want to produce or purchase. 
    4. Enter the start date and finish date of the planned order. 
    5. Click “Save” to save your changes and create the planned order. 
    
    Other Recommendations: 
    It is recommended that users check the material requirements planning data before creating a planned order with MD41. This will ensure that all necessary information is entered correctly and that there are no discrepancies between the material requirements planning data and the master production schedule. Additionally, users should check that all necessary fields are filled out correctly before saving their changes and creating the planned order.
    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic T-Code Explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MD40 - Planification PDP...

  • MD27 - Afficher périodes MRP...

  • MD42 - PdP - individuel - mononiveau...

  • MD43 - PdP - individuel - interactif...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author