Transaction Code: MD40
Description: Planification PDP
Release: S/4HANA and ECC 6
Menu Path:
Program: SAPMM61X
Screen: 110
Authorization Object:
Development Package: MD03
Package Description: Application Devt ERP MPS/Deterministic Requirements Planning
Parent Package: APPL
Module/Component: PP-MRP-BD
Description: Master Data
Overview: The SAP transaction code MD40 is used to run the Material Requirements Planning (MRP) planning run. This planning run is used to determine the material requirements for a given period of time. It takes into account the current stock levels, planned orders, and forecasted demand. The output of the planning run is a list of planned orders that can be used to replenish stock levels. Functionality: The MD40 transaction code is used to run the MRP planning run. This planning run takes into account the current stock levels, planned orders, and forecasted demand. The output of the planning run is a list of planned orders that can be used to replenish stock levels. The MRP planning run also takes into account any safety stock levels that have been set up in the system. Step-by-step How to Use: 1. Enter the transaction code MD40 in the command field. 2. Enter the material number for which you want to run the MRP planning run. 3. Select the “Planning Run” option from the menu bar. 4. Select the “Execute” button to start the MRP planning run. 5. The output of the MRP planning run will be displayed in a list format with details such as material number, quantity, and date of delivery for each planned order. 6. Select the “Save” button to save the output of the MRP