How to use MDLD - Print MRP List


SAP Transaction Code - Details

  • Transaction Code: MDLD

    Description: Print MRP List

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Materials Management > Material Requirements Planning (MRP) > MRP > Evaluations > Print of MRP List
    • Logistics > Production > Production Planning > MPS > Evaluations > Print MRP Lists
    • Logistics > Production > MRP > Evaluations > Print MRP List
    • Logistics > Production - Process > Production Planning > MPS > Evaluations > Print MRP Lists
    • Logistics > Production - Process > MRP > Evaluations > Print MRP List
    • Logistics > Project System > Material > Planning > MRP List > Print
    • Accounting > Project System > Material > Planning > MRP List > Print
    • Information Systems > General Report Selection > Materials Management > Consumption-Based Planning > Print MRP List
    • Information Systems > General Report Selection > Production Planning > Material Requirements Planning > Print MRP List
  • Show technical details Hide technical details
    • Program: RMDLDR00

      Screen: 1000

      Authorization Object:

    • Development Package: MD

      Package Description: Application Development R/3 Material Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MDLD - Print MRP List
    
    Overview:
    The SAP transaction code MDLD is used to print the Material Requirements Planning (MRP) list. This list contains all the materials and components that are required for a particular production order. It also includes the quantity of each material and component that is needed. 
    
    Functionality: 
    The MDLD transaction code allows users to view and print the MRP list for a particular production order. This list contains all the materials and components that are required for the production order, as well as the quantity of each material and component that is needed. The MRP list can be used to ensure that all materials and components are available before production begins. 
    
    Step-by-step How to Use: 
    1. Enter the transaction code MDLD in the command field. 
    2. Enter the production order number in the Order field. 
    3. Select the Print option from the menu bar. 
    4. Select the Print MRP List option from the drop-down menu. 
    5. Select the Print button to print out the MRP list for the production order. 
    
    Other Recommendations: 
    It is recommended that users review and check the MRP list before beginning production to ensure that all materials and components are available and in sufficient quantities. Additionally, users should also check for any discrepancies between the MRP list and actual inventory levels before beginning production.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MDL3 - Display Production Lot...

  • MDL2 - Change Production Lot...

  • MDLP - MPS...

  • MDM1 - Mail To Vendor...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author