How to use MDBT - MRP Run In Batch


SAP Transaction Code - Details

  • Transaction Code: MDBT

    Description: MRP Run In Batch

    Release: S/4HANA and ECC 6

    Menu Path:

    • Logistics > Materials Management > Material Requirements Planning (MRP) > MRP > Planning > Total Planning > As Background Job
    • Logistics > Production > MRP > Planning > Total Planning > As Background Job
    • Logistics > Production - Process > MRP > Planning > Total Planning > As Background Job
  • Show technical details Hide technical details
    • Program: RMMDBTCH

      Screen: 1000

      Authorization Object:

    • Development Package: MD

      Package Description: Application Development R/3 Material Requirements Planning

      Parent Package: APPL

    • Module/Component: PP-MRP-BD

      Description: Master Data


Smart SAP Assistant

  • SAP Tcode: MDBT - MRP Run In Batch
    
    Overview:
    MDBT is an SAP transaction code used to run the Material Requirements Planning (MRP) process in batch mode. It is used to plan material requirements for production and purchasing. The MRP process helps to ensure that the right materials are available at the right time and in the right quantity. 
    
    Functionality:
    MDBT allows users to run the MRP process in batch mode, which means that the process can be run without user intervention. This allows users to plan material requirements more efficiently and accurately. The MRP process takes into account current stock levels, planned orders, and forecasted demand to determine what materials need to be purchased or produced. 
    
    Step-by-step How to Use:
    1. Enter transaction code MDBT in the command field. 
    2. Select the plant for which you want to run the MRP process. 
    3. Select the MRP type you want to use (e.g., net change planning). 
    4. Select the planning horizon (e.g., one month). 
    5. Select the planning parameters (e.g., lot size calculation). 
    6. Select the scheduling parameters (e.g., lead time calculation). 
    7. Select the output parameters (e.g., print list of planned orders). 
    8. Execute the MRP process by clicking on “Execute” button. 
    9. Review the output of the MRP process and take necessary actions (e.g., create purchase orders). 
    
    Other Recommendations:
    It is recommended that users review their MRP settings regularly to ensure that they are up-to-date and accurate. Additionally, users should review their output regularly to ensure that their material requirements are being planned correctly and that any necessary actions are taken in a timely manner.
    • Do you have any question about this t-code?


      Upgrade now to chat with this t-code.

Related SAP Transaction Codes

Click the links below to see the following related SAP tcodes:
  • MDBS - MPS - total planning run...

  • MDBGVR - Maintain ApplicationID-GRPVAR...

  • MDBTVR - Create variant for tab...

  • MDC6 - Start of MD06 via Report...


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author