Transaction Code: MDBS
Description: MPS - total planning run
Release: S/4HANA and ECC 6
Menu Path:
Program: RMMDBTCH
Screen: 1000
Authorization Object:
Development Package: MD03
Package Description: Application Devt ERP MPS/Deterministic Requirements Planning
Parent Package: APPL
Module/Component: PP-MRP-BD
Description: Master Data
Overview: The SAP transaction code MDBS - MPS - total planning run is used to generate a total planning run for the material requirements planning (MRP) process. This transaction code is used to create a total planning run for the MRP process, which is used to determine the necessary materials and components needed to produce a product. Functionality: The MDBS - MPS - total planning run transaction code is used to generate a total planning run for the MRP process. This transaction code allows users to create a total planning run for the MRP process, which is used to determine the necessary materials and components needed to produce a product. The total planning run will also take into account any changes in demand or supply that may have occurred since the last planning run. Step-by-step How to Use: 1. Enter the transaction code MDBS - MPS - total planning run in the command field. 2. Select the “Total Planning Run” option from the menu. 3. Enter the required parameters such as plant, material, and date range. 4. Select “Execute” to generate the total planning run. 5. Review the results of the total planning run and make any necessary changes or adjustments. 6. Select “Save” to save the changes made in the total planning run. 7. Select “Back” to return to the main menu of the transaction code MDBS - MPS - total planning run. Other Recommendations: It is recommended that users familiarize themselves with all of the parameters available in this transaction code before running a total planning run, as this will ensure that all necessary information is taken into account when generating a total planning run for the MRP process. Additionally, users should review and adjust any changes made in the total planning run before saving it, as this will ensure that all necessary changes are taken into account when generating a total planning run for the MRP process.