Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close
  1. SAP Glossary
  2. SCM-Master Data
  3. engineering change order type


What is 'engineering change order type' in SAP SRD-SCM-MD - SCM-Master Data?


engineering change order type - Overview

  • Component: SRD-SCM-MD

  • Component Name: SCM-Master Data

  • Description: The grouping of engineering change orders ECOs according to whether a user needs to document changes to a production bill of material BoM or extend the validity date of a completed ECO. There are two types: single date orders and single date validity orders.


engineering change order type - Details


  • Key Concepts: An engineering change order type is a type of document used in SAP to manage changes to engineering documents. It is used to track changes to engineering documents such as drawings, specifications, and bills of materials. It is part of the SAP SCM-Master Data component.
    How to use it: To use an engineering change order type in SAP, you must first create a document type for the change order. This document type will define the fields and data that will be included in the change order. Once the document type is created, you can create a change order using the document type. The change order will contain all of the necessary information about the changes being made to the engineering documents.
    Tips & Tricks: When creating an engineering change order type in SAP, it is important to ensure that all of the necessary fields and data are included in the document type. This will ensure that all of the necessary information is captured when creating a change order. Additionally, it is important to ensure that all of the necessary approvals are obtained before making any changes to engineering documents.
    Related Information: For more information on engineering change orders in SAP, please refer to SAP's official documentation on Engineering Change Management (ECM). Additionally, there are many online resources available that provide detailed tutorials on

    Already have an account? Login here!





engineering change order type - Related SAP Terms

Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant