Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close
  1. SAP Glossary
  2. SCM-Master Data
  3. engineering change order


What is 'engineering change order' in SAP SRD-SCM-MD - SCM-Master Data?


engineering change order - Overview

  • Component: SRD-SCM-MD

  • Component Name: SCM-Master Data

  • Description: A directive to change the product content of a production bill of material. Before the input products controlled by an engineering change order ECO can be used in the system: The validity date on which the system automatically implements changes must be reached The ECO must be at the status of Completed


engineering change order - Details


  • Key Concepts: An Engineering Change Order (ECO) is a document used in SAP to record and track changes to a product or process. It is used to document the changes that have been made, the reasons for making them, and the impact of the changes. ECOs are typically used in engineering and manufacturing environments.
    How to use it: In SAP, ECOs are created using the SRD-SCM-MD SCM-Master Data component. This component allows users to create ECOs, assign them to specific products or processes, and track their progress. ECOs can also be linked to other documents such as drawings, specifications, and test results.
    Tips & Tricks: When creating an ECO in SAP, it is important to ensure that all relevant information is included. This includes the reason for the change, the impact of the change, and any other documents that may be related to the change. Additionally, it is important to ensure that all stakeholders are aware of the change and its implications.
    Related Information: For more information on ECOs in SAP, please refer to the SAP Help Portal or contact your local SAP support team. Additionally, there are many online resources available that provide detailed information on how to create and manage ECOs in SAP.

    Already have an account? Login here!





engineering change order - Related SAP Terms

Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant