Do you have any question about this SAP term?
Component: SCM-APO-SNP
Component Name: Supply Network Planning (SNP)
Description: The time at which the shelf life of the product will end.
Key Concepts: Expiration time is a setting in SAP Supply Network Planning (SNP) that determines the length of time a planned order is valid. It is used to ensure that the planned order is not used for too long, as it may become outdated due to changes in the supply chain. How to use it: Expiration time can be set in the SNP planning book. The user can specify the length of time for which the planned order will be valid, and the system will automatically delete the order after that period has elapsed. The user can also manually delete the order before it expires. Tips & Tricks: It is important to set an appropriate expiration time for each planned order. If the expiration time is too short, then orders may be deleted before they can be used. If it is too long, then orders may become outdated and no longer reflect current supply chain conditions. Related Information: Expiration time is related to other settings in SNP such as lead time and safety stock. Lead time determines how long it takes for an order to be fulfilled, while safety stock ensures that there are enough materials available to meet demand. Together, these settings help ensure that orders are fulfilled in a timely manner and that materials are available when needed.