1. SAP Glossary
  2. Model Mix Planning
  3. position restriction


What is position restriction in SAP SCM-APO-PPS-MMP - Model Mix Planning?


SAP Term: position restriction

  • Component: SCM-APO-PPS-MMP

  • Component Name: Model Mix Planning

  • Description: Restriction category you can use to schedule orders with a particular characteristic to certain positions within the sequence.


Smart SAP Assistant

  • Key Concepts: 
    Position restriction is a feature of Model Mix Planning (MMP) in SAP Advanced Planning and Optimization (APO). It allows users to limit the number of positions that can be planned for a particular product in a given period. This helps to ensure that the planned production does not exceed the available capacity. 
    
    How to use it: 
    Position restriction can be set up in the MMP planning area. The user can specify the maximum number of positions that can be planned for each product in each period. This number can be adjusted as needed to ensure that the planned production does not exceed the available capacity. 
    
    Tips & Tricks: 
    It is important to remember that position restriction only applies to the MMP planning area and not to other areas of APO. Therefore, it is important to ensure that position restriction is set up correctly in order to avoid over-production. 
    
    Related Information: 
    For more information on position restriction, please refer to the SAP Help documentation on Model Mix Planning (MMP).
    • Do you have any question about this SAP term?


      Upgrade now to chat with this SAP term.

Related SAP Glossary Terms

Click the links below to see the following related SAP glossary terms:
Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author