Do you have any question about this SAP term?
Component: PP-FLW
Component Name: Flow Manufacturing
Description: The period with which you can evaluate the operating time utilization of a production line in sequencing.
Key Concepts: Evaluation period is a feature of the PP-FLW Flow Manufacturing component in SAP. It is used to define the period of time during which a production order is evaluated for its performance. This evaluation period can be used to measure the efficiency of the production process and identify areas for improvement. How to use it: The evaluation period can be set up in the PP-FLW Flow Manufacturing component in SAP. The user can define the start and end dates of the evaluation period, as well as any other parameters that need to be taken into account when evaluating the production order. The user can also specify which data points should be included in the evaluation, such as production costs, labor costs, and material costs. Tips & Tricks: When setting up an evaluation period, it is important to ensure that all relevant data points are included in the evaluation. This will ensure that the results of the evaluation are accurate and meaningful. Additionally, it is important to ensure that the start and end dates of the evaluation period are set correctly, as this will affect the accuracy of the results. Related Information: For more information on setting up an evaluation period in SAP PP-FLW Flow Manufacturing, please refer to SAP’s official documentation on this topic. Additionally, there are many online resources available that provide detailed instructions on how to set up an evaluation period in SAP.