Do you have any question about this SAP term?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Component: PP-CRP
Component Name: Capacity Requirements Planning
Description: The time period between the end of the planning period and the end of the evaluation period. During this time, the capacity commitment cannot be changed by planning or rescheduling.
Key Concepts: The post-evaluation period in SAP PP-CRP Capacity Requirements Planning is a period of time after the planning run has been completed. During this period, the system evaluates the results of the planning run and makes any necessary adjustments. This period is also known as the “post-processing” phase. How to use it: The post-evaluation period is used to ensure that the results of the planning run are accurate and up-to-date. During this period, the system will check for any discrepancies between the planned and actual capacity requirements and make any necessary adjustments. The length of the post-evaluation period can be adjusted in the system settings. Tips & Tricks: It is important to set an appropriate length for the post-evaluation period. If it is too short, then the system may not have enough time to make any necessary adjustments. On the other hand, if it is too long, then it may take too long for changes to be made. Related Information: The post-evaluation period is an important part of SAP PP-CRP Capacity Requirements Planning. It helps ensure that the results of the planning run are accurate and up-to-date. For more information on how to use this feature, please refer to SAP’s documentation on PP-CRP Capacity Requirements Planning.