Do you have any question about this SAP term?
Component: MFG-CAM
Component Name: SAP Complex Assembly Manufacturing
Description: A type of bill of material that shows the product as designed by engineering.
Key Concepts: Engineering bill of material (EBOM) is a type of bill of material used in SAP Complex Assembly Manufacturing (MFG-CAM). It is a list of components and assemblies that are used to create a product. It includes the quantity and type of each component, as well as any additional information needed to manufacture the product. How to use it: The EBOM is used to define the structure of a product and its components. It is used to create a manufacturing plan for the product, which includes the steps needed to assemble the product. The EBOM can also be used to track changes in the product design over time. Tips & Tricks: When creating an EBOM, it is important to ensure that all components are accurately listed and that all information is up-to-date. This will help ensure that the manufacturing process runs smoothly and that the final product meets quality standards. Related Information: The EBOM is closely related to the material requirements planning (MRP) system, which is used to plan and manage materials for production. The MRP system uses the EBOM to determine what materials are needed for production and when they should be ordered.