Do you have any question about this SAP term?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Component: BC-RRR
Component Name: Ready-to-Run R/3
Description: A predefined delivery of the R/3 Ready-to-Run System. There are seven sizes available. With the exception of the PO Package they all contain a production system, a test system and a utility server. You can use the Configuration Assistant to calculate a suitable size.
Key Concepts: Package size is a term used to describe the size of a component in the BC-RRR Ready-to-Run R/3 system. It is measured in megabytes (MB) and is used to determine the amount of disk space needed to install the component. How to use it: When installing a component in the BC-RRR Ready-to-Run R/3 system, you will need to know the package size of the component. This information can be found in the installation guide or on the product page. Once you know the package size, you can determine how much disk space is needed for installation. Tips & Tricks: When installing components in the BC-RRR Ready-to-Run R/3 system, it is important to make sure that you have enough disk space available for all components. If you do not have enough disk space, you may need to uninstall other components or purchase additional storage space. Related Information: For more information about package size and other terms related to SAP software, please refer to the official SAP documentation. Additionally, there are many online resources available that provide helpful tutorials and tips for using SAP software.