How To Fix O1026 - La première date de planif. ne correspond pas à date de début &. Vérifiez


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 026

  • Message text: La première date de planif. ne correspond pas à date de début &. Vérifiez

  • Show details Hide details
  • Quelle est la cause de ce problème?

    "Valid from" date in quantity schedule does not match the first
    schedule line in the quantity schedule.
    &SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
    This message is controlled by Table T160M (System Messages).
    If it is defined as "W" (Warning), you get a warning message; if it is
    defined as an error, you get an error message (default W). If the
    message occurs while processing a contract, the system is not able to
    check and update the relevant contract scheduling line with a requested
    <DS:GLOS.delivery date>delivery date</> delivery date, which is before
    the date of the 1st scheduling (-> see message O1094 ). Within the
    call-off, the system is not able to check the goods receipt/delivery
    against the call-off schedule line, the update of a
    <DS:GLOS.goods receipt>GR</>/<DS:GLOS.delivery>delivery</> occurs
    in the last schedule line of the related
    <DS:GLOS.release order>call-off</>.
    The reason that the message appears may be that after creating the
    (quantity schedule), the validity period changed or a schedule line was
    manually deleted.

    Comment corriger cette erreur?

    Check the validity period in the quantity schedule.
    Check the first scheduling date of the schedule lines.
    If a warning appears and you insert a new scheduling period, please use
    a valid function key (e.G. Select all, Deselect all...) with a POPUP,
    press cancel on the popup-screen or call QS again after leaving.
    Insert a new scheduling line (period) with the first
    <DS:GLOS.factory_calendar>factory</> day after "valid from" date
    <ZH>or</> use function "Restructure QS".
    &DEPENDENCIES&
    <DS:DE.OIA_ENTLU>Breakdown indicator</> and <DS:DE.VONDAT>valid from
    date</>

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP O1026 - La première date de planif. ne correspond pas à date de début &. Vérifiez ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant