How To Fix O1026 - La première date de planif. ne correspond pas à date de début &. Vérifiez


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 026

  • Message text: La première date de planif. ne correspond pas à date de début &. Vérifiez

  • Show details Hide details
  • Quelle est la cause de ce problème?

    "Valid from" date in quantity schedule does not match the first
    schedule line in the quantity schedule.
    &SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
    This message is controlled by Table T160M (System Messages).
    If it is defined as "W" (Warning), you get a warning message; if it is
    defined as an error, you get an error message (default W). If the
    message occurs while processing a contract, the system is not able to
    check and update the relevant contract scheduling line with a requested
    <DS:GLOS.delivery date>delivery date</> delivery date, which is before
    the date of the 1st scheduling (-> see message O1094 ). Within the
    call-off, the system is not able to check the goods receipt/delivery
    against the call-off schedule line, the update of a
    <DS:GLOS.goods receipt>GR</>/<DS:GLOS.delivery>delivery</> occurs
    in the last schedule line of the related
    <DS:GLOS.release order>call-off</>.
    The reason that the message appears may be that after creating the
    (quantity schedule), the validity period changed or a schedule line was
    manually deleted.

    Comment corriger cette erreur?

    Check the validity period in the quantity schedule.
    Check the first scheduling date of the schedule lines.
    If a warning appears and you insert a new scheduling period, please use
    a valid function key (e.G. Select all, Deselect all...) with a POPUP,
    press cancel on the popup-screen or call QS again after leaving.
    Insert a new scheduling line (period) with the first
    <DS:GLOS.factory_calendar>factory</> day after "valid from" date
    <ZH>or</> use function "Restructure QS".
    &DEPENDENCIES&
    <DS:DE.OIA_ENTLU>Breakdown indicator</> and <DS:DE.VONDAT>valid from
    date</>

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP O1026 - La première date de planif. ne correspond pas à date de début &. Vérifiez ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author