Message type: E = Error
Message class: O1 - IS-Oil : Message pool exchanges
Message number: 027
Message text: Comparez la dern. date planif. & au code de type périod.
It could be that the last scheduling period does not match the
<DS:DE.BISDAT>"valid-to" date</> and the
<DS:DE.OIA_ENTLU>breakdown indicator</>,
which means that the last period has a date which is too early. A
subsequent scheduling period may have been deleted manually or the
validity period was changed after the quantity schedule was created.
&SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
This message is controlled by Table T160M (System Messages). If the
type does not have an initial value (empty), it appears as a warning
message.
Check the "valid-to" date in the quantity schedule.
Check the breakdown indicator.
Check the schedule lines (last schedule line).
Insert a scheduling period after the last scheduling period.
Extrait du message d'erreur du système SAP. Copyright SAP SE.
Get instant SAP help. Sign up for our Free Essentials Plan.
O1026
La première date de planif. ne correspond pas à date de début &. Vérifiez
Quelle est la cause de ce problème? "Valid from" date in quantity schedule does not match the first schedule line in the quantity schedul...
O1025
Qté cible EQ : & & - total référencé : & (&)
Quelle est la cause de ce problème? Several <DS:GLOS.release order>call-off</> items with the same contract item reference. The SUM of ...
O1028
Qté EM au & & > qté disp., (période EQ : & &)
Quelle est la cause de ce problème? <DS:GLOS.goods receipt>Goods receipt</> quantity exceeds the available quantity in the quantity sc...
O1029
Qté livrée au & & > qté disp., (période EQ : & &)
Quelle est la cause de ce problème? The delivered quantity exceeds the available quantity in the quantity schedule for this item, the <DS:DE.UEB...
Cliquez sur ce lien pour rechercher tous les messages SAP.