Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix MD504 - &1 : opération de préférence au niveau du composant (U1)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: MD - Material Requirements Planning (MRP)

  • Message number: 504

  • Message text: &1 : opération de préférence au niveau du composant (U1)

  • Show details Hide details
  • Quelle est la cause de ce problème?

    The rescheduling check has calculated that the receipts of the
    components are not available until too late of a date. The delay time
    displayed indicates the number of workdays by which the component
    receipt with the greatest delay for meeting the necessary availability
    date is delayed in realation to the whole BOM structure. The delay
    times for individual component receipts are added by the BOM hierarchy
    levels.

    Réponse du système

    This exception message appears in the MRP list for a planning run in
    the main memory.

    Comment corriger cette erreur?

    Check whether you can give preference to the receipts for the
    components causing the delay. You can access these receipts by choosing
    the function 'Order structure' for the receipt you are viewing.

    Extrait du message d'erreur du système SAP. Copyright SAP SE.


Smart SAP Assistant

  • Quelle est la cause et la solution de l'erreur SAP MD504 - &1 : opération de préférence au niveau du composant (U1) ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Messages d'erreur SAP associés

Cliquez sur les liens ci-dessous pour voir les messages connexes suivants:

Cliquez sur ce lien pour rechercher tous les messages SAP.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker